The short answer
A professionally built small business website of 5–15 pages typically takes 4–8 weeks, and a standard online store 8–16 weeks, according to published industry guides. Working directly with one developer is often quicker: my 5-page business websites usually take around 10 days, and a straightforward one can be ready in 5–7 days once the content is ready. The biggest factor isn’t the build itself; it’s how quickly content and feedback arrive.
“How long will it take?” is usually the second question after “how much will it cost?”. This guide gives you the typical timelines, my own timelines with real examples, what slows projects down and how to get your site live sooner.
Typical website timelines
| Type of website | Built yourself | Built professionally |
|---|---|---|
| Simple brochure site (1–5 pages) | 1–3 days | 1–2 weeks |
| Small business site (5–15 pages, blog, forms) | 1–2 weeks | 4–8 weeks |
| Online store (10–100 products) | 3–6 weeks | 8–16 weeks |
| Website redesign (small to mid-size business) | – | 12–16 weeks with an agency |
Build ranges from Elementor; redesign range from LowCode Agency. WPX puts a WordPress small business site at 4–6 weeks. Agency timelines include several people, meetings and approval rounds.
How long a website takes with me
I design and build every site myself, so there are no handoffs between a designer, a developer and an account manager. That’s the main reason my timelines are shorter than the agency ranges above.
- 5-page business website: usually around 10 days. A straightforward one can be ready in 5–7 days.
- Larger business websites: Kapalua Networks (12+ pages, WordPress and Elementor) took 15 days to the first full build, and Line Worker Solutions (15+ pages) took 12 days.
- Online stores and redesigns: these depend on the number of products, payment and shipping setup, and how much of the existing site is being kept, so I confirm the timeline in your fixed quote.
These are working timelines, not guaranteed deadlines: they assume content and feedback arrive on time, and larger or more complex projects take longer. Every fixed quote includes the timeline before any work starts.
The stages of a website project
1. Conversation and planning
Understanding your business, goals and customers, usually over messages and, when it helps, a short call. This is where the pages, platform and scope are agreed.
2. Structure and design
Planning the page structure, design direction and content layout, then designing the key pages for your review.
3. Build
Developing the site on the chosen platform, including forms, booking or shop features and mobile layouts.
4. Testing and revisions
Checking every page on phones, tablets and desktops, then working through your feedback.
5. Launch
Connecting your domain, final checks and going live, with a recorded walkthrough so you can manage the site yourself.
What slows a website project down
Most delays have nothing to do with the build. In my experience, these are the most common:
- Late content. Text, images and service descriptions that aren’t ready. Industry guides call this the number one reason projects stall.
- Slow feedback. Design previews or finished sections waiting days for review and approval.
- Changing requirements. New pages, features or major design changes added after the project has started.
- Third-party access. Waiting on domain logins, hosting, payment gateways, booking systems or other integrations.
- Unclear direction. Business details, requirements or design preferences that need more discussion before work can continue.
How to get your website live sooner
- Prepare your content early: service descriptions, about text, photos, logo and any reviews you want to show.
- Agree the scope upfront and keep new ideas for a second phase after launch.
- Have one decision-maker who can review and approve quickly.
- Gather access in advance: domain, hosting, email and any booking or payment accounts.
- Give feedback in one round per stage, collected in one message, rather than piece by piece.
Before each project I explain exactly what I need from you and when, so nothing waits on surprises.
Frequently asked questions
Can a website be built in a week?
A simple 5-page business website can be, if the content is ready and feedback is quick: my straightforward 5-page sites take 5–7 days. Larger sites, stores and custom features take longer.
Does a redesign take longer than a new website?
Often, yes. A redesign adds a review of the existing site, moving content across and setting up redirects so you keep your search rankings. My website redesign checklist covers every step, and website redesign shows how I handle it.
Does it take longer to build on WordPress or Squarespace?
The platform matters less than the scope. Both of my larger examples above were built in around two weeks. If you’re still choosing, read Squarespace vs WordPress.
How much will it cost?
Business websites start from $1,200 for up to 5 pages. See how much a small business website costs or get a fixed quote with your timeline.
Get a fixed price for your site
Tell me what you need and you'll get a free website plan with a fixed quote within 24 hours. No obligation.
Get my free website planBook a free call →See small business website design →


